Pilot protocol
A pilot designed to decide, not to reassure.
- Design
- Before/after, same people
- Participants
- 15
- Duration
- 8 weeks
You expect 20%: if the gain is real, the measurements will show it.
1. Objective and hypothesis
The pilot must establish whether AI cuts the time needed for the use case by at least 20% — from 45 min to about 36 min per task — without degrading quality.
2. Design and size
The same 15 people are measured without AI, then with it. Each is their own comparison, which removes differences between people. To show a 20% gain you need 14 people; with 15, the smallest demonstrable gain is 18.8 %.
| Participants | Smallest demonstrable gain |
|---|---|
| 5 | 59.3 % |
| 8 | 30.9 % |
| 10 | 25.4 % |
| 12 | 22 % |
| 15 | 18.8 % |
| 20 | 15.7 % |
| 30 | 12.3 % |
| 40 | 10.5 % |
| 60 | 8.4 % |
| 80 | 7.2 % |
| 120 | 5.9 % |
3. Timeline
| Week | Phase | What happens |
|---|---|---|
| W1 | Baseline measurement | Time 10 tasks per participant, without AI. |
| W2 | Baseline measurement | Time 10 tasks per participant, without AI. |
| W3 | Onboarding | Training, access, measurement instructions. No measurement this week. |
| W4 | Pilot | Measure tasks with AI. |
| W5 | Pilot | Measure tasks with AI. |
| W6 | Pilot — mid-point | Check everyone is measuring; collect first feedback; change nothing in the protocol. |
| W7 | Pilot | Measure tasks with AI. |
| W8 | Analysis and decision | Compare, apply the decision criteria fixed in advance, decide. |
4. What is measured
| Measure | How to measure it |
|---|---|
| Time per task | Timing of 10 tasks per person per period, logged in a shared sheet. |
| Quality | Blind review of a sample of deliverables (with and without AI mixed) by someone who does not know which is which, scored 1 to 5. |
| Adoption | Share of participants using the tool at least three days a week. |
| Perceived usefulness | One question at the end of each week: "The tool saved me time this week" (1 to 5). |
| Errors and rework | Number of deliverables sent back or corrected afterwards. |
5. Decision criteria, fixed before starting
6. Biases to watch
- Volunteering — volunteers are the most comfortable with the tool; their gains overstate the rest of the team's.
- Novelty effect — early enthusiasm fades; hence at least three weeks of pilot.
- Observer effect — knowing you are measured makes you faster, with or without AI; hence measuring during the baseline too.
- Easy tasks — measuring only the tasks AI is good at overstates the gain; draw tasks at random from the real flow.
- A before/after on the same people is economical, but anything else that changes over the period (workload, seasonality, reorganisation) reads as an AI effect. Log those events.
7. Sign-off
Generated by i-avantage's “Design a pilot” tool, in your browser. The default spreads are orders of magnitude: replace them with those measured in the baseline week.